Skip to main content

Port of Brindisi, chosen as professionals to draw up the new Port Regulatory Plan (1st classified).

The port of Brindisi will have a new Regulatory Plan: approved for the first time in 1975 and then renewed in 2006, today it shall represent, in the evolving context, the main strategic and planning tool for the port’s activities, also outlining the overall structure of the works of great infrastructures in the Brindisi port.

“We have formed a team of absolute excellence to design and plan the port of the future – comments the president of AdSPMAM Ugo Patroni Griffi -. With the precious support of Sogesid we have set up a group capable of giving substance to our vision of development and growth of the port of Brindisi, and of adequately addressing a complex and multidisciplinary subject. We must proceed swiftly. The main strategic and planning tool for a port’s activities, in fact, cannot refer to 1975, but must be in step with the times, in a context of continuous and rapid evolution and in absolute synchrony with the new environmental protection policies. We have focused a lot on the high professionalism of the team with a double objective: to carry out highly qualified and futuristic work, and, at the same time, to drastically reduce the crossing times, those dead times involved in bureaucratic and authorization procedures. A maze of passages which, according to the most recent estimates, accounts for 54.3% of the overall time required to complete the works “.